About this project: The Suez /Ain-Sokhna railway line was exposed to the torrents on 25-26/4/2018, which caused severe damage in the distance from 33 km to about 39 km.
This project aims to: Study and design the protection work necessary to avoid the hazard of torrents in this distance from the railway line (Al-Adabiya / Ain-Sokhna).
Scope: Preparing a several specialized studies in the study area, these studies include the following:
- Regional study for region.
- Metrological study.
- Soil surface study.
- Morphological study.
- Hydrological study.
- Selecting protection works against torrents hazard.
- Designing the proposed protection works against torrents hazard.
- Preparing complete set of tender documents.
|