FIELD OF WORK Integrated Engineering Studies
LOCATION Suez / Ain-Sokhna
CLIENT Egyptian National Railways
TIME SPAN 2018

Project details

About this project:
The Suez /Ain-Sokhna railway line was exposed to the torrents on 25-26/4/2018, which caused severe damage in the distance from 33 km to about 39 km.

This project aims to:
Study and design the protection work necessary to avoid the hazard of torrents in this distance from the railway line (Al-Adabiya / Ain-Sokhna).

Scope:
Preparing a several specialized studies in the study area, these studies include the following:

  • Regional study for region.
  • Metrological study.
  • Soil surface study.
  • Morphological study.
  • Hydrological study.
  • Selecting protection works against torrents hazard.
  • Designing the proposed protection works against torrents hazard.
  • Preparing complete set of tender documents.