Project details
|
Project Objectives:
- Connecting the industrial community in Sadat City with Embaba/Etai El Baroud railway line through a double track railway line with maximum speed of 160 km/hr.
- Providing high efficient transport rail service for both freights and passengers.
Project Outputs:
- Comprehensive detailed drawings for track including horizontal and vertical alignment.
- Comprehensive detailed architectural and structural drawings for all structural works along the route.
|