Project details
|
About This Project: This project aims to:
- Connecting the two stations Al-Domeir and Al-Qaboon through a double track railway line with maximum speed of 160 km/hr for passenger trains and 120 km/hr for freight trains.
- Providing high efficient transport rail service for both freights and passengers using trains with electric motive power and overhead power supply.
Scope:
- Comprehensive detailed drawings for track including horizontal and vertical alignment.
- Preliminary architectural and structural drawings for stations and all structural works along the route.
|