RSCCE
Breadcrubs


FIELD OF WORK Transportation Engineering
LOCATION Syria
CLIENT Syrian Railways General Est
TIME SPAN 2005-2007

Project details

About This Project:
This project aims to:

  • Connecting the two stations Al-Domeir and Al-Qaboon through a double track railway line with maximum speed of 160 km/hr for passenger trains and 120 km/hr for freight trains.
  • Providing high efficient transport rail service for both freights and passengers using trains with electric motive power and overhead power supply.

Scope:

  • Comprehensive detailed drawings for track including horizontal and vertical alignment.
  • Preliminary architectural and structural drawings for stations and all structural works along the route.